A few days after the last batch, I walked through the construction area on East Kalamazoo Street again to see how things had developed. This short stretch of walk on the north side of Kalamazoo between Detroit and Howard lacks a stamp, but it is part of the work being done by MacKenzie Co.
What’s interesting to me about this spot is the little jog in the walk. This is one of the intermittent areas in the Lansing Township stretch of Kalamazoo that did already have sidewalk. The stretch of walk in front of the the two buildings here hugs both buildings, but as the building to the east is further forward on its lot, the sidewalk jumps abruptly a few feet on either side of the driveway. What has changed is that it now follows a defined curving path through the driveway. I’m not sure that there’s any functional difference – nothing stopped one from walking across the driveway before – but I greatly appreciate the aesthetic improvement and I’m impressed that they bothered.